Home Repairs & Maintenance 1 day

Deck board replacement and re-oil.

Kingscliff. Replaced six split hardwood boards, sanded the surrounding area and applied two coats of decking oil to match the existing finish.

Project
018
Completed
Apr 2026
Build time
1 day
Footprint
3.6 x 1.2 m
Split and weathered deck boards before repair in Kingscliff Before
Kingscliff deck after board replacement and oiling by Fixline After
Deck board replacement and re-oil, Kingscliff. Replaced six split hardwood boards, sanded the surrounding area and applied two coats of decking oil to match the existing finish.

The job

What we walked into, and what we did.

The problem

Several deck boards had split along the grain after years of coastal weather, creating trip hazards and letting moisture into the subframe. The owner wanted the boards replaced without re-doing the entire deck.

Our approach

We pulled the damaged boards, checked the joists underneath for rot, cut new lengths of matching hardwood to size and fastened them with stainless steel screws. The surrounding boards were sanded back and the whole section received two coats of exterior decking oil.

The result

The repaired section blends with the rest of the deck and the owner can walk barefoot again without catching splinters. Total turnaround was one full day on site.

Materials

  • Spotted gum replacement boards
  • Stainless steel decking screws
  • Exterior decking oil (natural finish)

Named in writing

Materials and the honest number.

Timber Spotted gum (90 x 19 mm) Matched to existing board profile
Fasteners Stainless steel 10g x 50 mm
Finish Two-coat exterior decking oil
Boards replaced 6
Deck board replacement
$840
Fixed price, materials included
Labour (1 day)$480
Timber and fasteners$260
Decking oil and sundries$100
Price a project like this

1 day

How the job ran.

  1. Morning

    Strip and inspect

    Removed damaged boards, checked joists for moisture damage and prepped the subframe

  2. Midday

    Cut and fasten

    Cut replacement boards to length, fitted and secured with stainless screws

  3. Afternoon

    Sand and oil

    Sanded the repair zone flush, applied two coats of decking oil and cleaned up

On site

A closer look.

“Turned up on time, matched the timber perfectly and left the site cleaner than he found it. Really happy with the result.”
Donna M. · Kingscliff
Get started

Start with a measured quote, not a brochure.

Send a photo and a short description. We will call you back within two hours to book a time or give you a price over the phone for the simple jobs.

✓ NSW licensed contractor✓ Insured to $20M✓ 93 five-star reviews✓ Same-day callback guarantee✓ No call-out fee within 35 km
Get a same-day quote Call